B03-2024 - Skillman Road Pathway Phase 2

Bid/RFP Status
Closed - no longer accepting bids and proposals
Bid/RFP Due Date
Bid/RFP Reference Number
B03-2024
Back to Bids/RFPs

NOTICE TO BIDDERS NOTICE IS HEREBY GIVEN that sealed bids will be received by the Purchasing Agent of the Township of Montgomery on Wednesday, March 13, 2024 at 10:00 AM local prevailing time in the Montgomery Township Municipal Building Meeting Hall, Room 118A, 100 Community Drive, Skillman NJ 08558 at which time bids will be opened and read in public for: SKILLMAN ROAD PATHWAY PHASE 2 PROJECT DESCRIPTION 

The Township of Montgomery is accepting bids for the SKILLMAN ROAD PATHWAY PHASE 2 project which includes asphalt pathway, concrete sidewalk, ADA-compliant pedestrian curb ramps, curb, temporary traffic control measures, traffic signage, pavement striping, soil compaction mitigation, lawn restoration, installation of ADA-compliant push button on existing signal pole, and associated work on Skillman Road (C.R. 602). Approximate Major Pay Items Include: Excavation, Unclassified 1,088 CY Disposal of Regulated Material 600 TONS Dense Graded Aggregate Base Course, Var. Thickness 5 TON Asphalt Paved Pathway 1,775 SY Concrete Sidewalk, 4” Thick 64 SY 9” x 20” Concrete Vertical Curb 35 LF Traffic Stripes, Thermoplastic, 24" Wide 48 LF Regulatory and Warning Signs 144 SF Push Button 1 UNIT 

Bid documents are available electronically in PDF format only. Please contact the Engineering Department during regular business hours 8:00 am to 4:30 pm by email. The prospective bidder shall provide an email address which permits delivery certification and the requester shall confirm receipt of the bid documents in writing. Submit electronic bid document requests and written questions to: EngineeringBids [at] twp.montgomery.nj.us

Community Center

Otto Kaufman
356 Skillman Road
Skillman, NJ 08558
(609) 466-3023

Main Offices

Police

Emergency: Dial 911
Non-Emergency: (908) 359-3222